ATT&NW Railway, September 27th 2013
Friends Weekend - Day 1

Today's activity was to run the wire for the two semaphores installed at the station and to wire the semaphores and install the controls in the cabinet at Deer Ridge Tunnel. ATT&NW Friends ran the wires while I installed and wired the controls at the Deer Ridge Cabinet. Other friends worked on fixing the 2nd semaphore, Mike Walsh rewired the motor and replaced the motor leads while John Caples and others worked on fixing the light sockets and installed them. We got both signals running and installed about 5PM. Another group of friends worked with Alex beams and did track work around the railroad and some friends were out oiling switches and greasing the tracks.