Project #0736
Page 1 Page 2 Page 3 Page 4
Page 5


Project #0736 is placing several more signals and installing the cabinets to control them plus the controls. We are going to be replacing the old conduit with new. We are using a Allen Bradley SLC-500 to control the signal contactors. The SLC-500 is running simple timming programs for each signal, this way we can change the programming when we wish and add more signals when ever we want.


Needs to be
unloaded

Off the truck ok


After it fell


I broke the
rectifiers




Broke the relays


The relays I just
fixed

Only two not
broken

Waits for
foundation




Waits for mast


Swapping Relay
Contacts

Removing Bad
Contacts

Bad Contact


Good and Bad
Contacts

Bad Contacts
Removed

Good Contacts
Installed

Finished Product


Rewiring


Looking
Better

A Rats Nest


More Signals!


Placing Signals


Tall!





Broken Base


Needs Work


TO Signal


Cabinet as I got
It

Contactors


Connecting the 110V


Cleaned Up.


SLC-500
Installed

Main Power


Programming


Upright


Signal Contactors


PLC





Door Installed


Signal Contactors
Wired

Connections


Needs to be
removed

Ouch