Project #0735
We are installing several signals at ZCG Utility Scrap in Beaufort Mo. This project is Phase I of several Phases. Phase I is to install items[ 1,2,3,4,7 ] and the conduit for items [ 5,6,8 ]. Phase II which is project #0736, is expected to start in the spring of 2007 and will run along side of Phase I. We did not combine them becuase of the Items we are to install and the timming. Phase II is installing items [ 5,6,8 ]. We are also wiring Item #7 which is our Main Power Transfer Cabinet. We have changed plans for the signal arrangement and are adding another cabinet which will be the Secondary Power Transfer Cabinet. This new cabinet and signals will be Project #0736. Below are the PDF files that show all the connections in the Main Power Transfer Cabinet and the proposed version:
Current Configuration
Proposed Configuration

Item: 1- Train Order Signal
Item: 2- US&S Subway Signal
Item: 3- Safetran 2 Aspect Dwarf
Item: 4- L&W Signal
Item: 5- US&S Searchlight with lower Cabinet
Item: 6- Crossing Signal with Bell
Item: 7- GRS Cabinet (Power Supplies and Controllers)
Item: 8- GRS Cabinet (Crossing Controls for Item: 6)

Lifting the signal
|

Ready? !
|

Going Up
|

Jake installs the lens
|

Me...
|

Who needs a ladder?
|

|

Working in the rain
|

|

Getting fixed
|

|

A nice find
|

|

GRRR
|

Works!
|

|

The guts
|

Interesting..
|

Front Painted
|

Touch up Piant
|

Primer
|

|

All Primed
|

Fresh Alum Paint
|

Interesting...
|

|

L&W Looks Good
|
|